PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing ductwork at the 2nd floor Facing East.jpg Installed steal beams at the 4th floor East Elevation.jpg Started excavating Boiler Room for the underground electrical roughing Facing South-East.jpg Started installing ductwork at the 3rd floor Facing West.jpg Welded metal clips along column H-1 Facing East.jpg